Preview v5 – Preparing to Build in Melbourne

Building a New Home in Melbourne: A Practical Pre-Build Checklist

Guide · New builds

Planning a new home in Melbourne? This guide covers the site checks, permits and paperwork that set your build up for success, and shows how far beyond the minimum energy standard a home can go.

7★

The code minimum: the NatHERS energy rating every new Victorian home must meet

90%

Up to 90% less heating and cooling energy in a Passive House than in a conventional building

0.6

Passive House airtightness limit (air changes per hour at 50 Pa), tested on site

This is a general guide only. Building rules change from time to time and every project is different, so please seek professional advice for your own site and design.

01

Preparing for a new home in Melbourne

The most successful builds share one thing: good preparation before construction starts.

Building a new home in Melbourne is one of the most rewarding projects you can take on. A few early checks on your land, your permits and your design can save time, keep the budget on track and help you end up with a home that is comfortable for decades. Below is the preparation we walk our clients through, from the first look at the block to the day the excavator arrives.

02

Code minimum vs Passive House

Every new home in Victoria must meet the 7-star minimum. At Goycon, we treat that as the starting line, not the finish line.

Passive House (Passivhaus) is a voluntary international standard from the Passive House Institute in Germany. It sets measurable targets for heating demand, airtightness and comfort, and each certified home is tested on site and certified independently (Australian Passive House Association). The Association notes that Passive Houses use up to 90% less energy for heating and cooling than a conventional building (Australian Passive House Association).

It is the standard we are always striving for, and the one behind our Kallista Passiv Haus. Here is how the two compare.

Code minimum7-star NatHERSPassive HouseWhat we strive for
StatusMandatory for new Victorian homes since 1 May 2024Voluntary international standard, set by the Passive House Institute
Main measureA 7-star NatHERS rating for the building shell, plus a Whole of Home rating of at least 60Heating demand of no more than 15 kWh per m² per year (or a 10 W/m² peak load)
AirtightnessNo set air-change target to meet0.6 air changes per hour at 50 Pa or less, tested on site
ComfortBased on the modelled heating and cooling loadsNo more than 10% of hours in a year above 25°C
VerificationEnergy rating of the design by an accredited NatHERS assessorIndependent certification by a Passive House Institute accredited certifier
Energy useMeets the code minimumUp to 90% less heating and cooling energy than a conventional building
Sources: Energy Victoria; Building and Plumbing Commission; Australian Passive House Association.

03

Start with your site

Every good home design begins with a clear picture of the land it sits on. These three checks are quick to do and shape almost every decision that follows.

i

Zone and overlays

Every parcel of land in Victoria has a planning zone, and many carry overlays such as heritage or vegetation. Look yours up free on VicPlan and download a Planning Property Report.

ii

Title, easements and covenants

Your title and plan of subdivision show boundaries, easements and any covenants on what can be built. Consumer Affairs Victoria’s Due diligence checklist is a helpful prompt list.

iii

Soil and site conditions

A soil test and a feature and level survey guide slab and footing design, and map slope, trees and services. On sloping, treed blocks in the Dandenong Ranges and Yarra Valley, they help the design work with the landscape.

04

Understand the permits

In Victoria, planning permits and building permits do different jobs, and many new homes need both. Knowing the order early helps you plan a realistic timeline.

Step one · if required

Planning permit

How can this land be used and developed?

Relates to your council’s planning scheme. Whether you need one depends on your zone, overlays and lot size, so start with your Planning Property Report and your council’s planning team. Where needed, it generally comes before detailed design and the building permit (Cardinia Shire Council).

Step two · always for a new house

Building permit

Does the design meet the building regulations?

Needed before construction starts, with an occupancy permit before you move in (City of Boroondara). A registered building surveyor checks the design, issues the permit and inspects through to completion (Building and Plumbing Commission).

Your builder will usually help coordinate both steps with your building surveyor and council.

05

Design for performance

7 stars is the floor, not the goal. Planning for performance from day one is the simplest and most cost-effective way to go further.

Energy efficiency: 7 stars and Whole of Home

Since 1 May 2024, new homes in Victoria must meet a minimum 7-star energy rating under NatHERS and a Whole of Home energy budget covering fixed appliances such as heating, cooling, hot water and lighting (Energy Victoria). Under the NatHERS option, the Whole of Home rating must be no less than 60 (Building and Plumbing Commission).

Good orientation, shading and glazing choices, considered early in design, help keep the cost of meeting these standards low. Taken further, with high insulation, airtight construction and heat-recovery ventilation, the same decisions lead toward Passive House performance.

1
2
3
4
5
6
7
8
9
10
Minimum for new Victorian homes: 7 starsBeyond the minimum, toward Passive House

NatHERS rates a home’s thermal performance out of a possible 10 stars (Energy Victoria).

Core strategy

Treat energy performance as a design brief, not a compliance box.

Orientation, insulation, airtightness and window placement decided at concept stage cost far less than changes made later, and they are what make a home feel comfortable all year.

For clients who want to go further, the same principles scale up to Passive House performance, as in our Kallista Passiv Haus project.

06

Choose your team and contract

A good team turns a design into a finished home, and a clear contract keeps everyone on the same page.

Registered builder

Delivers the build and coordinates trades from site start to handover.

Designer or architect

Shapes the layout, orientation and look of your home.

Structural engineer

Designs footings and structure to suit your soil and site.

Energy rater

Models the design for its NatHERS star and Whole of Home ratings.

Building surveyor

Issues the building permit and inspects the work.

 

Work with a registered builder

Builders must be registered with the Building and Plumbing Commission (formerly the Victorian Building Authority) to carry out domestic building work, and you can confirm registration using its Practitioner Search (Domestic Building Insurance, VMIA).

Understand your building contract

For projects over $10,000, the builder must use a major domestic building contract, which must be in writing and set out the work in detail (Consumer Affairs Victoria). Before you sign, your builder must give you the Domestic Building Consumer Guide, and the contract includes a checklist for you to complete (Consumer Affairs Victoria). Take the time to read it in full; Consumer Affairs Victoria also recommends getting legal and technical advice before signing.

07

Before the first dig

Before any excavation, a free enquiry with Before You Dig Australia provides plans of underground services such as power, gas, water and telecommunications from registered asset owners. Your builder will normally lodge this, but it is good to confirm who is responsible before site works begin.

Bringing it all together, here is your pre-build checklist for a new home in Melbourne, in three phases.

Phase one

Know your land

  • Zones and overlaysVicPlan Planning Property Report
  • Title, easements and covenantsCertificate of title; CAV checklist
  • Soil test and site surveyGeotechnical engineer; land surveyor

Phase two

Design and approvals

  • Planning permit, if requiredYour local council
  • Structural designStructural engineer, using your soil test
  • Energy target: 7-star minimum or Passive HouseDesigner, energy rater or Passive House designer

Phase three

Ready to build

  • Registered builder and contractBPC Practitioner Search; CAV
  • Building permitRegistered building surveyor
  • Underground services checkBefore You Dig Australia

A general guide only. The steps that apply, and their order, depend on your own project, site and council.

Please note

This article is a general guide only and is current as of November 2026. Building rules and regulations change from time to time, and every project is different, so what applies to your build will depend on your own site, council and design. Please seek advice from your local council, a registered building surveyor and other qualified professionals before making any decisions.